  Process To Build a 30' x 24' Detached Hip Garage  
     
 
1. Overview of the completed garage 2. Removal of old garage slab.
 
 
  
3. Gravel base foundation used for added strength and stability. 4. Forming for new garage slab with wire mesh and rebar in place.
 
    
5. Pouring of concrete foundation for new garage. Concrete is 4" thick. 6. Completion of concrete slab and concrete apron.
 
  
7. Installation of foundation block to keep garage framing above ground height.
 
8 & 9. Framing of stud walls. 2 x 4's at 16" on-center and installation of OSB sheating.
 
10. Roof framing of a Hip style garage. 11. After one day of framing the garage is completely framed.
 
12. Applying 30yr. Dimensional shingles 13. Completion of a custom Classic Builders Deluxe Hip style garage.
 
14. Front view of 30' x 24' Hip garage.
 
 
     
     